...
- As with any other device, the physical address must also be assigned to the CODESYS controller.
Therefore the data point must be set after the request in the ETS:
If this is done promptly, then the assignment of the physical address is documented in the ETS.
Because the controller does not have a valid program yet, it must still be downloaded from the ETS.
Likewise, the actuator (channel B) can be switched by means of I/O mapping.